WAC 296-155-110 requires a construction employer to (1) develop a formal accident prevention program tailored to the operation and its hazards, (2) put it in writing, (3) run a safety orientation covering seven named topics, (4) hold crew leader–crew safety meetings at the start of each job and at least weekly, with documented attendance and subjects, (5) keep meeting minutes on site and retain them for at least a year, and (6) conduct documented walk-around safety inspections, jointly with an employee representative, on the same start-of-job and weekly rhythm. Everything below is those requirements in detail, cited to the subsection that imposes them.
1. A formal program, tailored to your work — subsection (2)
The rule's own words: you must "develop a formal accident-prevention program, tailored to the needs of the particular plant or operation and to the type of hazard involved." A roofing company's program and a framing company's program should not read the same, because their hazards are not the same. The same subsection notes that the department may be contacted for assistance in developing appropriate programs — L&I help is built into the rule itself.
2. The program must be in writing — subsection (4)
"You must outline each accident-prevention program in written format." A program that lives in the owner's head, or in habits the crew happens to follow, does not meet this element. Written means a document that can be shown, handed over, and reviewed.
3. A safety orientation covering seven topics — subsection (3)
The minimal program elements for all employers start with a safety orientation program describing the employer's safety program, including all seven of these:
(a) Reporting injuries
How, where, and when to report injuries, including instruction as to the location of first-aid facilities.
(b) Reporting unsafe conditions
How to report unsafe conditions and practices.
(c) PPE
The use and care of required personal protective equipment.
(d) Emergencies
The proper actions to take in the event of emergencies, including the routes of exiting from areas during emergencies.
(e) Hazardous materials
Identification of the hazardous gases, chemicals, or materials involved, with instructions on safe use and emergency action following accidental exposure.
(f) The total safety program
A description of the employer's total safety program.
(g) On-the-job review
An on-the-job review of the practices necessary to perform the initial job assignments in a safe manner.
4. Crew leader–crew safety meetings — subsections (5) and (6)
Meetings are not optional extras; the rule schedules them and tells you what they must cover:
- When: at the beginning of each job, and at least weekly thereafter — subsection (5)(a).
- Tailored: meetings must be tailored to the particular operation — subsection (5)(b).
- Content: a review of any walk-around safety inspection conducted since the last meeting; a review of any citation, to assist in correction of hazards; and an evaluation of any accident investigations conducted since the last meeting, to determine whether the cause of the unsafe acts or conditions was properly identified and corrected — subsection (6)(a)–(c).
- Documented: you must document attendance, and you must document the subjects discussed — subsection (6)(d) and (e). This is the line that turns a talk into a record.
One practical note from the rule itself: subcontractors and their employees may, with the general contractor's permission, attend the prime contractor's crew leader–crew safety meeting to fulfill the meeting requirement — but any of the review and documentation duties that the prime's meeting does not satisfy remain the individual employer's responsibility.
5. Meeting minutes: kept on site, kept for a year — subsections (7) and (8)
- Prepare minutes of each crew leader–crew meeting — subsection (7).
- Keep a copy at the location where the majority of the employees of each construction site report for work each day — subsection (7).
- Retain the minutes for at least one year, and make them available for review by department personnel upon request — subsection (8).
6. Walk-around safety inspections — subsection (9)
- When: at the beginning of each job, and at least weekly thereafter.
- Who: conducted jointly by one member of management and one employee, elected by the employees as their authorized representative.
- Records: inspections must be documented; the documentation must be available for inspection by department personnel; and records must be maintained until the completion of the job.
What an inspector can ask to see
The rule is written so that almost every element leaves a paper trail, and several subsections say outright that the records must be available to the department. If a DOSH inspector asks about your program, the documents the rule expects you to be able to produce are:
The paper trail WAC 296-155-110 expects
- The written accident prevention program itself, tailored to your operation (subsections (2) and (4))
- Orientation coverage of the seven topics in subsection (3)
- Crew meeting minutes showing attendance and subjects discussed (subsection (6)(d)–(e))
- A copy of the minutes kept where most of the crew reports for work (subsection (7))
- Minutes retained for at least one year (subsection (8))
- Walk-around inspection records, kept until the job is complete (subsection (9))
One exemption worth knowing: subsection (1) exempts workers of employers whose primary business is other than construction, when they are engaged solely in maintenance and repair work (including painting and decorating) on the employer's own premises, on a project of one week or less, provided the employer complies with the general-industry program and meeting rules (WAC 296-800-140 and 296-800-130). If your primary business is construction, this exemption is not yours.
Where toolbox talks and attendance logs fit
Look at the meeting requirements again: meetings at the start of every job and weekly, tailored to the operation, with attendance and subjects documented and minutes kept for a year. That is exactly the rhythm a toolbox talk program runs on — a short, job-specific talk, a signed attendance log naming the topic, the trainer, the date and the crew, filed the same day. Documented talks do not write your accident prevention program, and no pack of talks is a program by itself. What they do is give the meeting element of your program a ready-made structure: a real topic every week, in a language the whole crew understands, with the signed record the rule asks for.
The Safety Pack: 12 ready-to-run talks for the meeting your program requires
The BuildPaperwork Safety Pack gives you 12 ready-to-run toolbox talks — Fall Protection, Ladders & Stairways, PPE Basics, Electrical Safety, Scaffolding, Heat Illness Prevention, Excavation & Trenching, Power Tool Safety, Forklift Awareness, Slips, Trips & Falls, Hazard Communication, and Emergency Action & First Aid — each in English and Spanish, with printable attendance log sheets that capture the topic, trainer, date and signatures your meeting minutes need. Delivered by email, ready to print. To be clear about what it is not: it is not an accident prevention program, and it does not replace writing yours.
Monthly adds new topics over time and updated sheets when rules change; cancel anytime and keep what you downloaded. Prefer to look first? See everything that's inside the pack or start with the free Attendance Sheet guide and the free Attendance Sheet Generator.
Frequently asked questions
Does Washington require construction employers to have a written accident prevention program?
Yes. WAC 296-155-110(2) requires a formal program tailored to the operation and its hazards, and subsection (4) requires it to be outlined in written format.
How often must crew leader–crew safety meetings be held?
At the beginning of each job and at least weekly thereafter (subsection (5)(a)), tailored to the operation, covering inspection reviews, any citations, and accident-investigation evaluations — with attendance and subjects documented (subsection (6)).
How long must safety meeting minutes be kept?
At least one year, with a copy kept where the majority of the site's employees report for work each day, available to department personnel on request (subsections (7) and (8)). Walk-around inspection records are kept until the job is complete (subsection (9)).
Who has to take part in walk-around safety inspections?
One member of management and one employee elected by the employees as their authorized representative, jointly, at the start of each job and at least weekly (subsection (9)).
Is a toolbox talk pack the same as an accident prevention program?
No. Your program is your own written document, tailored to your work. The pack supplies talk topics and attendance logs that help you run and document the weekly crew meetings your program requires — nothing more, and it is not a substitute for the program.
Sources
Every requirement above comes from the official rule text: WAC 296-155-110, Accident prevention program (Washington State Legislature). Read the current version there before you rely on this summary — rules change, and the rule, not this page, is what an inspector enforces. For help building your program, Washington L&I (DOSH) offers free consultations, and subsection (2) of the rule itself points employers to the department for assistance.
Free guide and templates to help you prepare. This is not legal advice and does not guarantee compliance; Washington L&I offers free consultations. BuildPaperwork sells training materials and document templates — not legal advice. These materials are not an OSHA 10/30 card, and BuildPaperwork is not affiliated with OSHA or with Washington L&I. Questions: contact@buildpaperwork.com · Portland, OR.